Contact

altAbout us

Ergofém Kft. has been a 100% Hungarian-owned company since 1992.

The metal production plant is located on a 6,234 m² property in the countryside of Újkígyós, just 30 km from the Romanian border.
With over 30 years of professional experience, the company is able to perform the entire metal processing process thanks to continuous technological developments. This includes design, sheet metal cutting, edge bending, welding, metal surface treatment and assembly. The finished products are supplied to various industries (mechanical engineering, construction, furniture, energy, automotive, agriculture). The company's activities expanded in 2024 with the production of load-bearing steel structural elements.

In recent years, we have also opened up to the Romanian, German and Austrian markets, further expanding our export sales.

%

Hungarian company

  • Complete metal processing services in one place
  • International presence and stable market position
The Ergofém Kft. is also open to residential customers

The company is currently a leading market player in the southern Great Plain region and its catchment area with its activities

Our company places great emphasis on technical, technological, and human resource development, enabling us to provide our clients with a complete range of services in the field of metalworking.

Our mission
Our company is committed to carrying out our activities with full consideration of customer needs. We fulfill orders in the quality, quantity and deadline specified by the customer. In addition, we are open to implementing individual ideas.

alt

+

Professional experience

K

Happy
customer

+

Active
partnership

+

Five-star
review

Rural
property

isotanúsítvány

Quality Policy

In 2005, our company implemented the ISO 9001:2000 quality management system, which serves as a valuable tool contributing to high-quality performance.

szechenyi_2020_uj
Name of the beneficiary: Ergofém Gyártó és Szolgáltató Korlátolt Felelősségű Társaság

Project title: 'Installation of a 49.77 kWp solar panel system'

Project ID: GINOP-4.1.4-19-2020-01012
Amount of support: 8 483 047 forint
Rate of support: 55% of the total eligible investment cost.
Project description: Within the framework of the project, a solar panel system was installed for the purpose of generating electricity for the grid. The investment enables the partial replacement of primary electricity consumption with renewable energy sources and contributes to the reduction of greenhouse gas emissions.
Actual project completion date: April 26, 2021

szechenyi_2020_uj
Name of the beneficiary: Ergofém Gyártó és Szolgáltató Korlátolt Felelősségű Társaság

Project title: "Production Capacity Expansion Investment"

Project ID: GINOP-1.2.1.-16-2017-00137
Amount of support: 67 031 105 forint
Rate of support: 50% of the total eligible investment cost.
Project description: Within the framework of the project, real estate investment was carried out along with the acquisition of new machines, equipment, and the establishment of new technological systems. A new warehouse hall was constructed, and the following equipment was commissioned: an ERMAKSAN Speed-Bend 1270-60 press brake, an arc welding robot system with an OTC-FD-B4L robotic arm, and a Logi Tower single-column automatic sheet metal storage system. As a result of the improvement in technical and technological standards, productivity and production capacity have increased significantly.
Actual project completion date: Jan 02, 2019

szechenyi_2020_uj
Name of the beneficiary: Ergofém Gyártó és Szolgáltató Korlátolt Felelősségű Társaság

Project title: "Production Capacity Expansion and Factory Building Renovation"

Project ID: GINOP-1.2.1-15-2015-00082
Amount of support: 59 192 865 forint
Rate of support: 50% of the total eligible investment cost.
Project description: As part of the investment, an ERMAKSAN FIBERMAK 3000.3 x 1.5 fiber laser cutting machine, representing the latest in laser technology developments, has been commissioned. In addition to cutting steel and stainless steel sheets, the new system also enables the efficient cutting of highly reflective materials such as bronze, copper, aluminum, and galvanized steel. As a result of the improvement in technical and technological standards, productivity and production capacity have increased significantly.
Actual project completion date: Jun 14, 2016